Gantt Chart Template: Free Layouts for Excel and Google Sheets

Tasin AhmedSaaS Content Writer
Published
Reading time10 min
Gantt chart template with a seven-column task list, date grid and bars for a 30-day project plan
Start using Onethread today
Manage all your projects in one place
Plan tasks, timelines and workloads
Keep clients and your team on one page
Book a demo
Share in ✕ Copied

A Gantt chart template gives you the task list, date grid and bars before you plan a single task.

A Gantt chart template is a reusable timeline that lists tasks with start dates and durations, then draws each as a bar. Excel has no built-in Gantt chart type, so you start from a template.

We read the 11 top-ranking template pages and the Excel and Google Sheets help pages behind them.

Here's the layout to copy, the formulas that draw the bars, a filled-in example and the point where a spreadsheet stops being enough.

Key Points

  1. A Gantt chart template is a reusable plan with seven columns: task, owner, start date, duration, end date, predecessor and percent complete. Excel has no built-in Gantt chart type, so you fill a template or draw the bars with a formula.
  2. In Excel, one conditional formatting formula colors the bars from the dates in each row. In Google Sheets, a stacked bar chart with a hidden first series does the same job.
  3. Pick the variant that answers your question: simple for status, dependencies for sequence, resource for workload, sprint for agile work.
  4. Switch to Gantt software when dependencies must move on their own, several people edit at once, or you need a baseline.
Anatomy of a Gantt chart template with the task list, date grid, bars, dependency arrow and milestone labeled
Diagram: Onethread. Elements per Wikipedia and Asana.

What Is a Gantt Chart Template?

A Gantt chart template is a reusable project timeline with the structure already built. It holds a task list, a date grid and bars sized to each task's duration. A new plan starts from filled columns, not a blank sheet.

A Gantt chart lists tasks down the left and time across the top. Henry Gantt designed his version around 1910 to 1915, and Karol Adamiecki published a similar tool in 1896.

Bar length shows duration. Modern versions add dependency links, progress shading and a vertical "today" line. APM notes that Gantt charts are usually the format cited in contracts.

A template also fixes the date math in advance. The end formula, the bar rule and the progress shading are set once, so you edit tasks, not formulas. Spreadsheet versions redraw the bars whenever you change a date or a duration. That saves the first hour of every new plan.

The template is the empty plan, and the chart is that plan with your data in it. Microsoft says Excel doesn't have a predefined Gantt chart type and points to templates instead.

Top Tip: Start from the question your stakeholders ask most, such as "are we on track?" Keep only the columns that answer it.

What Should a Gantt Chart Template Include?

A useful Gantt chart template needs seven columns. We settled on this layout after comparing the columns in the Asana, TeamGantt and Vertex42 templates.

ColumnWhat it holdsExample
TaskA short action nameWrite homepage copy
OwnerThe person or role responsibleCopywriter
StartThe day the work beginsDay 4
DurationDays the task takes6
EndStart plus duration minus 1Day 9
PredecessorThe task that must finish firstBrief
Percent completeProgress from 0 to 10040%

Add milestone rows for reviews and launch dates. Seven of the 11 pages we reviewed mention milestones.

How Do You Use a Gantt Chart Template in Excel?

Using a Gantt chart template in Excel takes five steps. Vertex42's template builds its bars from dates and formulas, and its guide covers end dates, work days and dependent tasks. The same approach works in a template you make yourself.

  1. Save a copy: Open the template and save it under the project's name, so the original stays blank.
  2. Replace the sample tasks: Type your tasks in column A and owners in column B.
  3. Enter dates: Put the first start date in column C and the duration in column D. Set each end date in column E to =C5+D5-1.
  4. Build the date grid: Type the project start in H4, then set I4 to =H4+1 and fill the formula to the right. Narrow these columns so the bars read as blocks.
  5. Check the bar rule: Select the date grid, then add a conditional formatting rule with the formula =AND(H$4>=$C5,H$4<=$E5). A cell turns solid when its column date falls between the start and end.

To chain two tasks, set the later start to the earlier end plus 1. Row 6 then reads =E5+1, so the second bar always begins the day after the first one ends.

Top Tip: If the plan skips weekends, replace the formula in column E with =WORKDAY(C5,D5-1), so each bar ends on a working day.

Excel conditional formatting formula coloring Gantt chart bars between each task's first and last day
Diagram: Onethread. Formula applied to the grid from H5 down; End = Start + Duration - 1.

How Do You Use a Gantt Chart Template in Google Sheets?

Copy the template, enter your dates, then update progress as work finishes. Google Sheets has no dedicated Gantt feature, so every Sheets template draws its bars from a stacked bar chart. Because Sheets runs in the browser, your whole team can open one plan without downloading a file.

With TeamGantt's template, choose File, then Make a copy, and save it to your Drive. It offers three tabs: a chart with progress tracking, a basic chart and a manual chart.

The chart works by stacking two series. A "Start on Day" series sits first with its fill set to 0%, so it disappears. The duration series stacks after it, and that visible bar becomes the Gantt bar for each task.

To track progress, set the Percent Complete column from 0 to 100 and the bars fill in. For a new fill color, click a cell in that column, then open Format, Conditional formatting and Color scale. Click Done to save it. Sheets also has a built-in Timeline view, but TeamGantt notes it isn't available on every account.

Watch one limit. As TeamGantt puts it, "Dependencies don't automatically shift tasks for you." Move one task and you re-date its followers by hand.

Google Sheets stacked bar chart with a hidden Start on Day series and a visible duration series forming Gantt bars
Diagram: Onethread. Method per TeamGantt's Google Sheets guide.

Which Gantt Chart Template Fits Your Project?

Match the template to the question you need answered. Planyway offers 10 Excel templates and Smartsheet lists 12, and they group into the seven types below.

TemplatePick it whenExtra columns to add
SimpleOne team, a few dozen tasks, regular status updatesNone
Weekly or 12-monthYou plan by week or across a full yearWeek or month headers
With dependenciesTasks must wait on other tasksPredecessor, lag days
Critical pathYou need to know what can't slipSlack days
ResourceYou balance workload across peopleHours per person
SprintAgile teams plan iterations and releasesSprint number
MilestoneLeaders want phases without task detailMilestone date

Planyway also lists plan-versus-actual and budget versions. The extra columns are our own suggestions, not part of any vendor's template.

Seven Gantt chart template types, simple to milestone, shown as small bar previews with when to use each
Diagram: Onethread. Template types drawn from Planyway, Smartsheet and Asana.

What Does a Filled-In Gantt Chart Template Look Like?

Here is a 30-day website relaunch plan. Each start comes from one rule: a task starts the day after its predecessor ends.

TaskStart dayDuration (days)End dayDepends on
Brief133None
Wireframes458Brief
Copy469Brief
Design9715Wireframes
Build161025Design, Copy
Test26429Build
Launch30130Test

Example: Wireframes start on Day 4 and last 5 days, so they end on Day 8 (4 + 5 - 1). Design starts on Day 9, and Build starts on Day 16 because it waits for Design, which ends on Day 15.

Brief, Wireframes, Design, Build, Test and Launch add up to 30 days (3 + 5 + 7 + 10 + 4 + 1). That chain is the critical path. Copy ends on Day 9 but isn't needed until Day 16, so it can slip 6 days.

Run the same tasks through our Gantt chart generator to see the bars. Enter each start day as an offset from the project start.

Gantt chart of a 30-day website relaunch plan with the critical path highlighted and Copy showing 6 days of slack
Source: Onethread worked example. Task dates are our own arithmetic.

When Should You Switch From a Template to Gantt Software?

Switch when the spreadsheet costs more time than the plan saves. Four signs point that way. Two or more mean you should price a tool:

  • Dependencies move by hand: Asana lists four dependency types and says spreadsheet templates lack built-in dependency tracking. ProjectManager, a software vendor, says templates can't link all four or set a baseline.
  • Several people edit: TeamGantt warns that multiple editors or copies create version problems.
  • The plan grows: TeamGantt says large Sheets plans "can get messy fast."
  • You report against a baseline: A template shows one plan, not planned versus actual.

APM notes that teams still draw many Gantt charts by hand in Excel or PowerPoint, with no logic underneath. Check the plan tier too: Asana lists Gantt charts on its Starter, Advanced, Enterprise and Enterprise+ plans.

Compare tools in our best Gantt chart software guide. For a free start, see free Gantt chart software and Gantt chart makers. Onethread's project planning features include a Gantt chart view with phases, milestones and dependencies.

Top Tip: Count the tasks that wait on another task. If you can't re-date them by hand in five minutes, you have outgrown the sheet.

Sources: Microsoft Support, Wikipedia, TeamGantt, Asana, Planyway, Smartsheet, Vertex42, ProjectManager, APM.

Decision flow for choosing between a spreadsheet Gantt chart template and Gantt software based on dependencies and editors
Source: Onethread analysis based on TeamGantt, Asana and ProjectManager.

What Should You Do Next With a Gantt Chart Template?

A Gantt chart template saves setup time. It works when the columns are right and the dates follow one rule. Seven columns and two formulas carry most plans: end equals start plus duration minus 1, and a follower starts the day after its predecessor ends.

This week, copy the seven-column layout into Excel or Google Sheets and enter your next project's tasks. Mark the chain that sets your finish date, and watch the other tasks for slack. If the sheet starts to fight you, that is your cue to price a proper tool.

FAQs

What Is the Difference Between a Gantt Chart and a Gantt Chart Template?

A Gantt chart shows one project's real tasks and dates. A Gantt chart template is the reusable structure behind it: the columns, formulas and formatting without your data. You copy the template for each new project, so the chart you finish with is yours and the template stays blank.

Can You Use a Gantt Chart Template for Agile Projects?

Yes. Sprint Gantt templates plot iterations and releases as bars, so you can see how sprints line up with milestones. Planyway lists a sprint Gantt, and Asana points agile teams to an agile project plan template. Keep the bars at sprint level and track individual stories on a board.

Can You Make a Gantt Chart Template in Word or PowerPoint?

Yes, but only as a picture of a plan. ProjectManager lists Word, PowerPoint, Google Docs and Google Slides templates, and says the Word version is not a project management tool. Use these formats for a stakeholder slide, and keep the working Gantt chart template in Excel or Google Sheets.

What Is the Best Tool for Using a Gantt Chart Template?

The lightest tool that handles your dependencies. Excel suits one owner working alone, and Google Sheets suits a small team editing together. Gantt software suits plans where dependencies must move on their own. Start with the spreadsheet, and move only when the manual updating starts to slow you down.

Can Several People Edit a Gantt Chart Template at Once?

In Google Sheets, yes. ProjectManager notes that Sheets supports real-time collaboration without downloads. An Excel file tends to spread as copies, and TeamGantt flags version problems as a risk. Share one Google Sheets file, or name one owner for the Excel Gantt chart template and send everyone else a view only copy.